The wave machine is able to generate a 2m high wave every minute, which will peel for more than 150m. The pool can accommodate up to 36 surfers at a time.
OLI SCARFF/AFP/AFP/Getty Images
The facility opened in August on the site of a former aluminum factory. It was developed in Spain and cost more than $18m to produce.